Use this window to create a work guideline for an operation. If the guideline is of type Subtask, the subtask can be signed off and/or inspection signed off by right-clicking and then clicking Sign Off or Inspection Sign Off.
Handle shop order material and operations
Report operations
Report operations 
from shop floor workbench
Handle repair 
shop order
Add work guideline to 
shop
order
Sign off
Inspection sign off