Create Analysis for Production Schedule Part
Explanation
Use this activity to create one or more analyses connected to a production schedule.
You may want to create more than one analysis to fulfill a particular
sample frequency.  For example, if you are producing the parts over a five
hour period and want to have a sample frequency  of once per hour, you
can create five analyses.
The routing operation number determines whether a
specific data point will be included in the created analysis. The routing operation
number is defined in Manufacturing Standards/Routings. 
Prerequisites
This activity requires a connection between an analysis type and one or more objects on
the production schedule. An
active Control Plan  Manufacturing must
exist for the part to be manufactured. The Control Plan is created in
IFS/Quality Management. 
System Effects
As a result of this activity, the system transfers the information specified in the dialog box to
IFS/Quality Management, where you can process it further by entering the analysis results. 
Window
Production Schedule by
Line
Production
Schedule
by Line Part
Production Line
Management
Production
Receipt
Report
Point Receipt
Related Window Descriptions
Production Schedule by Line
Production Schedule by Line Part
Production Line Management
Production Line Management/Current Production Schedule
Production Receipt
Report Point Receipt
Create Analysis
 Production Schedule
Production 
Schedule Analyses
Analysis Result
Procedure
  - Query or populate the window.
- Select the production line for which you want
    to create one or more analyses.
- In the 
	Production Schedule by Line and 
	Production
    Schedule by Line Part windows, select Create    Analysis from the right mouse button menu for the
    schedule for which you want to create an analysis. In the 
	Production Receipt
    and 
	Report Point Receipt windows, select Create Analysis
    from the right mouse button menu in the header of the window.
- In the 
	Production Schedule by Line and 
	Production
    Schedule by Line Part windows, select a Part Revision and Routing Revision using the List
    of Values.
    In the 
	Production Receipt and 
	Report Point Receipt
    windows, these fields are filled in by the system. These
    fields are required. 
- Routing Type,  Routing Alternate, and  Control Plan Details are filled in by
    the system.
- Select one or more routing operation numbers by selecting the check box adjacent to the
    Routing Operation
    No field for which you would like to create an analysis. Only the
    routing operation numbers connected to your Control Plan    Manufacturing for the specific
    routings will be displayed. This field is required.
- Select the number of analyses you wish to create in the  No of Analysis field.
- If desired, select the  Print Test Instruction check box to print a test
    instruction.
- Click OK. The system now creates one or more analyses of receipts over time for the
    selected production lines. 
- You will be asked if you would like to view the created analysis overview.
    If you click Yes, the Production Schedule Analysis
    window appears. 
- For more information on entering results, see Enter
    Results for Production Schedule Parts.