Enter Analysis Results for Production Schedule Parts
Explanation
Use this activity to enter analysis results for one or more analyses 
connected to a production schedule.
This activity allows you to record the measure quality results against the
quality test plan (Control Plan) on completion of a production schedule.
Specific quality test results for a part within a manufacturing cell are
recorded. The analysis must first be created during the production schedule
receipt process. 
You can change the status of a data point to Complete. Only data 
points in
complete status are considered when creating control charts or calculating capability indices.
    Once the data point has this status, the results cannot be edited. You can also create a new control chart
if SPC is
    activated in the control plan.
When all
    data points for an analysis have been reported, you can change the status to 
Confirmed.
Once an analysis has been confirmed, the results cannot be edited.
This activity contains a Security Checkpoint which can be activated by an 
administrator. With an activated security checkpoint on a function you will have 
to authenticate yourself again in order to fulfill the function. Additionally, 
whenever a security checkpoint is successfully passed a security checkpoint log 
is written, creating an audit trail of what is done.
Prerequisites
This activity has the following prerequisites:
  - This activity requires analyses to have been created in the 
	Production
Schedule by Line, 
	Production Schedule by Line Part, 
	Production
Receipt, or 
	Report Point 
	Receipt  window.
- To be able to enter analysis results, an analysis
    must exist in the Planned status. 
System Effects
As a result of this activity, analysis results has been 
entered, completed and confirmed. Once an analysis has been confirmed, the 
results cannot be edited.
  - Results can be used in the creation of various IFS/Quality Management charts. 
Window
Analysis 
Result
Overview Production Schedule Analysis
Related Window Descriptions
Analysis Result
Production Schedule Analysis 
 Create Analysis
 Production Schedule
Production Schedule Analyses
Procedure
To perform this activity, follow these steps:
  - If you are working on previously created analyses, open the 
	Analysis Results window and query for the part
    for which you want to enter data. 
- If you just created the analyses, the system prompts you to indicate 
	whether you want to view the created analysis overview. If you click Yes, 
	the Overview Production Schedule Analysis window appears. Right-click on the line for which you want to report results and
    then click Analysis Result to open the 
	Analysis Result window. 
- If the part is serial tracked and variable or 
	category data type results need to be 
	entered, right-click on the header and click Enter Serial Numbers. 
	The Enter Serial Numbers dialog box is opened. Select the 
	Selected Serial No check boxes for the corresponding serial numbers of 
	the parts included in the analysis. Click OK. 
- If the part is lot/batch tracked, and if the corresponding lot/batch 
	number has not been filled in Lot/Batch No field in the header, then 
	enter a value in the Lot/Batch No field. Use the List of Values to 
	select a suitable value. 
- To print a test instruction, right-click in the header and then click Print Test Instruction. The test instruction includes all control plan
    lines.
- Optionally, in the Analysis Results header, select a 
	filter value for the Data Point Filter field to populate the analysis 
	according to the selected option.
- For data points defined as variables, select the Variables tab 
	and enter your results in the Result field. For serial tracked parts, 
	the serial number also needs to be entered in the Serial No field. 
	Use the List of Values to select a suitable value. 
	If the data point has a connection to one or several tools, select a Tool 
	ID and Tool Instance from the List of Values in these fields.
- For data points defined as attributes, select the Attributes tab 
	and enter your results in the Nonconformities (c/u) and/or the 
	Nonconforming (np,p) fields. If the data point 
	has a connection to one or several tools, select a Tool ID and Tool 
	Instance from the List of Values in these fields.
- If the data type is categorical and Category 
	Entry Type is set to Single Row (visible in Detail tab), 
	select a category value ID for each data point. If Category Entry Type 
	is set to Multiple Row, enter a quantity for each category value ID 
	for each data point.
 For serial tracked parts, the serial number needs to be entered in the 
	Serial No field for all parts in the sample size. Use the List of Values 
	to select a suitable value.
 If the data point has a connection to one or several tools, select a tool ID 
	and tool instance from the List of Values in these fields.
- Save the changes.
- To change the status to Complete, right-click and then click Complete
    Registered Results.
- To create a new control chart if SPC is activated in the control plan,
    right-click on the line and click Create SPC Chart.
- To add document text to any line, right-click and click Document Text.
- To print a report of your results for any line, right-click and click Print Data Sheet.
- To confirm a single analysis, right-click in the header of the analysis
    and then click Confirm Registered Results. 
- When the analysis results are confirmed, the values
    in the Variable Result Status, Attribute Result Status 
	and Category Result Status fields are updated automatically. 
- To confirm multiple analyses, select one or more analysis in the 
	Production Schedule Analyses window, and then right-click and click 
	Confirm Registered
    Results.