Report Shop Order Operation
Explanation
Use this activity to report the time and quantity for a shop order operation. It can be the time needed to set up an operation
before manufacturing begins or the time of the actual manufacturing. The status of operations changes as you report them. This
lets you report as many or as few steps as you desire, depending on the degree of detail planned in operation reporting. You can
report more manufacturing or setup time than the default value.
If the operation is connected to a component line and that component line is 
not issued prior to reporting the operations, it will be issued using the 
backflush feature. If any of the components issued by the backflush 
feature is catch unit enabled, this activity can be performed only if the full quantity in the inventory part location is issued.
If only a part of the quantity in an inventory location is issued, you will have to
manually issue the components before reporting the operation.
This activity contains a Security Checkpoint which can be activated by an 
administrator. With an activated security checkpoint on a function you will have 
to authenticate yourself again in order to fulfill the function. Additionally, 
whenever a security checkpoint is successfully passed a security checkpoint log 
is written, creating an audit trail of what is done.
Prerequisites
	- The shop order operation must be in at least the Released status.
- If the Milestone Operation check box is 
selected for a preceding operation on the same shop order it must be reported 
before a succeeding operation can be reported.
- If the Over Reporting list is set to Not Allowed on the 
	Inventory Part/Manufacturing tab, the sum of the reported 
	quantity complete and scrap must be equal to, or less than the planned operation 
	quantity plus the defined over report tolerance.
- To be able to add an operation result to the time card of an employee, 
	the reporting mode must be Employee for the site set as 
	primary in Shop Floor Employee per Site.
System Effects
	- The status of the operation changes to either Setup Started, Setup Complete, 
	Partially Reported, or 
	Closed depending on what you report.
- When you report that an operation is complete, the
planned scheduling of the operation is reset so that the operation is released for another workload if the work center still has
capacity. 
- Operation-linked material which has not been issued is issued automatically. 
	
- When having operation-linked material line with a connected supply pegging, the issue will reduce the pegged quantity by the
same quantity that was issued. However, if there are more than one supply pegged to the same demand you will be notified to
manually adjust the peggings before the issue can be performed. Work In Process (WIP) transactions are created.
- If the Report Previous Operations check box has 
	been selected in the  Approve Operation 
	dialog box, previous operations will be reported up the level reported on 
	the current operation excluding operations set to parallel with the current 
	operation.
- If the Adjust Schedule Due To Shop Floor Reporting
check box has been selected in the Scheduling 
	Basic Data/Shop Order Scheduling/Scheduling Server tab, the schedule will be adjusted to 
reflect the reported time.
- If Buffered Operations Reporting is enabled and the Adjust Schedule Due To Shop Floor Reporting 
	check box in the Scheduling Basic Data/Shop 
	Order Scheduling/Scheduling Server tab has been selected, at the 
next execution of buffered operations reporting the scheduling server will 
adjust the operation time due to remaining quantity and:
	- if Prioritize Reported Operation was chosen 
	- the reported operation is given priority and scheduled as close as 
	possible to now time.
- if Keep Scheduled Operation Sequence was 
	chosen - the schedule will be updated without altering the previous schedule 
	sequence. Subsequent operations in the same order structure will move closer to the reported operation 
	in order to fill any capacity gaps which occur immediately after the reported operation.
 
- For project connected shop orders in 
	IFS/Project, the Labor Time, Setup Labor Time, Machine Time and 
	Setup 
	Machine Time will 
	be reported to the project as actual hours according to the project cost 
	elements that have been defined in the Posting Control setup.
Window
Report Shop Order Operation 
Report Work Center Operation
Shop Floor 
Workbench
Time Card - Day
Shop Floor Reports
Related Window Descriptions
Report Shop Order 
Operation/Internal Operations 
Report Shop Order Operation
Report Work Center 
Operation/Internal Operations
Report Work Center
Operation
Shop Floor Workbench
Shop Floor Workbench/Reports
Approve Operation
Time - Card - Day/Mfg Result
Shop Floor Reports
Procedure
From the Report Shop Order Operation window:
  - Search for the relevant shop order.
- In the 
	
  Internal Operations tab, 
	select the operation to report. 
- Specify the quantity complete to report in the Qty to Report field.
- Specify the duration of the machine setup time to report in the Mach Setup to Report 
	field. Enter zero (0) if you don't want to report any machine setup time.
- Specify the duration of the labor setup time to report in the Labor Setup to Rpt 
	field, and specify the number of employees that performed the setup of the 
	operation in the Setup Crew Size field. Enter zero (0) if you don't 
	want to report any labor setup time.
- Specify the duration of the machine run time to report in the Mach to 
	Report field, and specify how much of the resource capacity the 
	operation utilized during its duration in the Resource Share field. 
	Enter zero (0) if you don't want to report any machine run time.
-  Specify the duration of the labor run time to report in the 
	Labor to Report field, and specify the number of employees that 
	performed the run time of the operation in the Crew Size field. Enter 
	zero (0) if you don't want to report any labor run time.
- Select the line, right-click and then click Report, or save.
From the Report Work Center Operation window:
  - Search for the relevant work center.
- In the 
	
  Internal Operations tab, 
	select the operation to report. 
- Specify the quantity complete to report in the Qty to Report field.
- Specify the duration of the machine setup time to report in the Mach Setup to Report 
	field. Enter zero (0) if you don't want to report any machine setup time.
- Specify the duration of the labor setup time to report in the Labor Setup to Rpt 
	field, and specify the number of employees that performed the setup of the 
	operation in the Setup Crew Size field. Enter zero (0) if you don't 
	want to report any labor setup time.
- Specify the duration of the machine run time to report in the Mach to 
	Report field, and specify how much of the resource capacity the 
	operation utilized during its duration in the Resource Share field. 
	Enter zero (0) if you don't want to report any machine run time.
-  Specify the duration of the labor run time to report in the 
	Labor to Report field, and specify the number of employees that 
	performed the run time of the operation in the Crew Size field. Enter 
	zero (0) if you don't want to report any labor run time.
- Select the line, right-click and then click Report, or save.
From the Shop Floor Workbench window using the Approve 
Operation dialog box:
	- Select 
	the operation on which reporting should be done.
- Click the Approve Operation option to open 
	the dialog box.
- In the Operation Report area, enter the 
	quantity to report as complete in the Qty to Report field. If you 
	want to enter the quantity to report in an alternative unit of measure, 
	click the Input UoM option.
- If you want the operation to be closed, select the Close Operation
	check box.
- If you want preceding operation(s) to be reported up to the quantity 
	reported on the current operation, select the Report Previous Operation 
	check box.
- In the Operation Time section, enter the time to report in the Mach Setup 
	to Rpt, Labor Setup to Rpt, Mach to Rpt and Labor to Rpt 
	fields.
- If machine time or machine setup time is reported, 
	specify how much of the resource capacity the operation utilized during its 
	duration in the Resource Share field. 
- If labor time is reported, specify the crew size that worked on the 
	setup and run time in the Setup Crew Size and Crew Size 
	fields.
- If the site which the operation belongs to is 
	run in employee reporting mode you can optionally specify the employees that 
	worked on the operation by selecting the Report Employees check box 
	and enter a line for each employee. If a team is entered in Shop Floor 
	Workbench 
	the current team members will be displayed and may not be changed.
- Click OK.
From the Shop Floor Workbench/Reports, Shop Floor Reports
and Time Card - Day/Mfg Result windows using the Add Operation Result 
dialog box:
	- From the Shop Floor Workbench/Reports tab, 
	select Show Operation Reports option, right-click and 
	then click Add Operation Results. From the Time - Card - Day 
	window, right-click on the Mfg Result tab and then click 
	Add Operation Result. From the Shop Floor Reports window, 
	right-click and then click Add Operation Result. The Add 
	Operation Result dialog box will appear.
- In the Operation ID field, use List of Values to choose which 
	operation to register the reports on.
- In the Transaction Date field, enter the date on which the 
	activity occurred.
- In the Resource field, enter the work center resource on which 
	the operation was performed.
- In the Completed Qty field, enter the quantity to report as 
	completed.
- In the Scrapped Qty field, enter the quantity to report as scrap. 
	Enter the reason for the scrap in the Scrap Reason field. Optionally, 
	enter a scrap note in the Note field.
- If labor time is reported, Crew Size must be specified. If the 
	site is run in employee reporting mode you can instead specify the employee 
	that worked on the operation in the Employee field, or the team that 
	worked on the operation in the Team field.
- Enter the time you want to report in the Mach Setup, Mach Time,
	Labor Setup and Labor Time fields.
- If machine time or machine setup time is reported, specify how much of 
	the resource capacity the operation utilized during its duration in the 
	Resource Share field. 
- Click OK.