Promote Multiple Levels of Structures and/or Routings
Explanation
This activity is used to promote structures, routings and/or MRO maintenance 
and repair data. The set of data to be promoted is determined based on the 
multi-level structure of the specified part that conforms to the structure type 
or routing type specified by the user.
The multi-level structure is derived from the Effective Date entered by the 
user, finding the components for the specified part for each specified structure 
type, and the routings for these parts and components. If you have opted to 
promote MRO data, then the process will seek out the repair codes and/or maintenance 
levels for the related routings/structures and promote them to Active status as well.
Prerequisites
The structures and/or routings must be defined.
System Effects
The structures and/or routings are promoted to the selected status.
The 
repair codes for the related repair code routings and/or structures are promoted 
to Active status.
The maintenance levels for the related maintenance level 
routings and/or structures are promoted to Active status.
Window
Multilevel Promotion
Related Window Descriptions
Multilevel Promotion
Procedure
	- Enter the site in the Site field, or click List 
	to select from a list of values. Your default site is automatically 
	suggested by the system.
- In Part No field, enter the part for which you want the 
	related structure, routings or MRO data to be promoted, or click 
	List to select from a list of values.
- In Effective Date enter the date to find the structure 
	or routing revisions for promotion. The range between Phase In Date and 
	Phase Out Date is compared to the effective date to determine which revision 
	to process. Use the various structure and routing forms to determine the 
	proper effective date (typically the Phase In Date of the target revision). 
	Use the multi-level display to see the component revisions included for the 
	effective date.
- In the Structure Types area check the check boxes for 
	the types of structures you want to promote.
- Select the structure status to promote to in the Structure 
	Status list.
- In the Routing Types area check the check boxes for the 
	types of routings you want to promote.
- Select the routing status to promote to in the Routing Status 
	list.
- In the MRO Data Promotions area check the check boxes 
	for the related repair codes and/or maintenance 
	levels you want to promote to Active status.