Import Customer Schedule Plan Demand for Level 1 Part
Explanation
Use this activity to import a user-specified set of customer
scheduling plan demands that have been generated in IFS/Customer Scheduling. 
This activity allows you to represent plan demands from Customer Scheduling as 
forecasts in Master Scheduling. 
Prerequisites
This activity requires the existence of a Level 1 Part that has an associated set of
plan demands in IFS/Customer Scheduling.  
System Effects
As a result of this activity, the system imports a set of customer plan demands from
IFS/Customer Scheduling for the specified Level 1 Part. The results appear
as forecast data in the 
Register Forecast tab of the 
MS Level 1 Part window..
Window
Import Customer Schedules
MS Level
1 Part
Related Window Descriptions
Import Customer Schedules
MS Level 1 Part/Register Forecast
Procedure
  - In IFS/Customer Scheduling, verify the existence of the plan demands that you want to
    import. 
- Open the Import Customer Schedules dialog box. 
- In the Site field, either accept the default value or enter another site for the Level 1
    part for which to import plan demands or  type in a value or use the 
	List button to
    select from a list of available sites.
- In the Part No field, type in a part number or use the 
	List button to select
    from a list of available parts. 
- In the Customer field, type in a customer ID number or use the 
	List button to
    select from available customers. If you leave this field blank, the system will select all
    available customers.
- In the To MS Set field, either accept the default value or enter the number of
    another MS set.
- In the Begin Date field, either accept the default value or enter another date on which
    you want to begin importing plan demands for the Level 1 part. If you
    leave this field blank, the system will import data from the earliest plan demand from the
    day after the demand time fence date through the End Date. 
- In the End Date field, enter the date on which you want to stop importing plan demands
    for the Level 1 part. If you leave this field blank, the system will import data from the
    Begin Date through the date of the latest plan demand.
- In the Forecast Distribution group box, click the 
	As Is or 
	Weekly
    radio button.
- In the Process group box, click the 
	Background or  
	Online 
	radio
    button.  
- If desired, select the check box at the bottom of the dialog box. This tells the system
    to import plan demands that are inside the planning time fence date.
- Click OK. The system imports the plan demands for the specified site, part, and
    customer within the selected time span. 
- If the import process is being done in the background, view its progress in the 
	Background
    Jobs window. 
- When the import process is complete, view the forecast data in the Register
    Forecast tab of the MS Level 1 
	Part window.