Define RRP Capacity
Explanation
This activity is used to change the resource capacity information automatically 
entered when you enter a work center, or change the load source. You can also 
connect additional scenarios with differentiated capacity and load sources.
Prerequisites
This activity requires that the work center has been registered. If 
connecting additional scenarios the scenarios must have alredy been registered.
System Effects
As a result of this activity, the system takes the specified quantity and/or 
efficiency into consideration when planning how much can be manufactured per day 
in the resource.
Window
Work Center
RRP Work Center Scenarios
RRP Load Analysis
Related Window Descriptions
Work Center
Work Center/RRP Capacity
RRP Work Center Scenarios
RRP Load Analysis
Procedure
From the Work Center window:
	- From the Work Center list, select the work 
	center for which you want to define capacity.
- Open the 
	RRP Capacity tab.
- In the Scenario list select the scenario you want to 
	define capacity for.
- If needed, create a new record in the table.
- In the Begin Date and End Date fields, 
	enter the start and end date for the capacity limitations.
- In the Units per Day and Efficiency fields, enter the 
	quantity that can be manufactured per day and/or efficiency during the period.
- In the Calendar ID field, enter the calendar you want 
	to use for the date range. Click List to select from available 
	calendars.
- Save the record.
From the RRP Work Center Scenarios window:
	- Search for the scenario for which you want to change capacity.
- In the Units per Day and Efficiency fields, enter the 
	quantity that can be manufactured per day and/or efficiency during the 
	period.
- In the Calendar ID field, enter the calendar you want 
	to use for the date range. Click List to select from available 
	calendars.
- Save the record.
From the RRP Load Analysis window:
	- Search for the scenario for which you want to change capacity.
- Open the 
	Work Center Scenarios tab.
- Click the node in the tree structure which represents the work center 
	for which you want to change capacity.
- In the Units per Day and Efficiency fields, enter the 
	quantity that can be manufactured per day and/or efficiency during the 
	period.
- In the Calendar ID field, enter the calendar you want 
	to use for the date range. Click List to select from available 
	calendars.
- Save the record.