Update Routing Revision and/or Alternate
Explanation
This activity is used to select a different routing revision and alternate for the shop
order. (The current operation list is automatically selected when the system registers the
shop order.) If the selected shop order is in the Parked status and the status before 
Parked was Reserved or Started, 
only the revision and/or alternate on the shop order head will be changed. If 
the shop order is for a part that has lot size based routing revision you can 
change to the correct alternative for the shop order lot size if the shop order 
is in the Planned or Released status.
Notes: 
This 
activity does not support configured parts. The activity Update 
Revision for configuration can be used instead, as alternates are 
updated from configuration rules.
For a shop order that was in the Reserved or Started 
status before the Parked status, all updates on  the Shop Order/Operation tab have to be done manually. 
In some instances, update is also possible to be done in the  the Compare Shop Order with Structure and Routing window.
Prerequisites
This activity requires that the shop order is in the Planned or Released 
status or the shop order in the Parked status with the Enable Rev/Alt to be Changed 
check box selected.
System Effects
	- The routing revision and/or alternate on the shop order head gets changed.
- If the shop order is in the Planned or Released status, the 
	machine and labor load is changed due to the new routing revision and/or alternate. 
- If any of the shop order operations has been connected to an operation 
	block, the operation(s) will be disconnected from the operation block.
- The shop order is not for a configured part.
Window
Shop Order
Operation Block
Related Window Descriptions
Shop Order
Operation Block
Operation Block/Connected Operations
Operation Block/Available Operations
Update
Operation and Alternate
Related Visualization Chart Descriptions
Shop Order Machine Load
Shop Order Labor Load
Machine Operation Load In Standard Hours
Labor Operation Load In Standard Hours
Procedure
To update routing revision from the Shop Order 
window:
  - Open the Shop Order  
	window.
- Search for the order to update the routing revision/alternate for.
- Right-click, point to Update Allocations and/or Operations, and 
	then click Update Routing Revision and/or Alternate. The
	Update Routing Revision and/or Alternative dialog box 
	appears. 
- Select the desired routing revision and alternate combination in the
	Revision field. Click List to select from available valid 
	combinations. 
- To change only the alternative, select the specific alternative in the
	Alternate field. 
- Click OK.
For a shop order with a lot size based routing revision
  - Open the Shop Order  
	window.
- Query for the record.
- Right-click, point to Update Allocations and/or Operations, and 
	then click Update Routing Alternate for Lot Size.
To update routing revision from the Operation Block 
window:
  - Open the Operation Block  
	window and search for the relevant operation block
- Click the Connected Operations 
	or Available Operations tab and select 
	the shop order operation to update the routing 
	revision/alternate for.
- Right-click, point to Update Allocations and/or Operations, and 
	then click Update Routing Revision and/or Alternate. The
	Update Routing Revision and/or Alternate dialog box 
	appears. 
- Select the desired routing revision and alternate combination in the
	Revision field. Click List to select from available valid 
	combinations. 
- To change only the alternate, select the specific alternate in the
	Alternate field. 
- Click OK.
To update routing revision and/or alternate using the visualizer view:
	- Open a visualizer enabled window 
	and query for the site needed.
- If the Data View is displayed, click 
	Visualization View on the title bar. 
	
- Right-click and click 
	Select Visualization. 
	The 
	Select Visualization dialog box is 
	opened.
- Double-click 
	Machine Operation Load in Standard Hours, 
	Labor Operation Load in Standard Hours, Shop Order Machine Load 
	or Shop Order Labor Load.
- Select the bar/segment 
	representing the shop order you want to update the routing revision and/or 
	alternative for, right-click
	and then click Update Routing Revision and/or Alternate. The
	Update Routing Revision and/or Alternate dialog box appears.
- Select the desired routing revision and alternate combination in the
	Revision field. Click List to select from available valid 
	combinations. 
- To change only the alternate, select the specific alternative in the
	Alternate field. 
- Click OK.