Set Up Priority Rule(s) per Site
Explanation
Use this activity to set up the priority rules that will be used on a site. The system
will use these rules when you process the reservation order during automatic order
processing or schedule the shop orders using Constraint Based Scheduling. This
is especially important when the need/due dates of several shop orders fall on
the same date, to determine the relative importance of shop orders. 
Prerequisites
A manufacturing site must exist.
System Effects
As a result of this activity:
  - You define priority rules for shop orders
that will be used on a site.
- These priority rules will be used when processing reservation orders
    during either the auto order processing function, or when shop orders are
    scheduled by the Constraint Based Scheduler.
Window
Shop Order Basic Data/Shop Order Priority
Related Window Descriptions
Shop Order Basic Data/Shop Order Priority
Procedure
  - Open the Shop Order Basic Data/Shop Order Priority  window.
- Populate the window to view existing values.
- Create a new record.
- In the Site field, specify the site for which you want to create the priority rule. Use
    the List of Values to select from available sites.
- In the Priority Category and Priority Description fields, enter the category of the
    priority and its description. The priority category ID is limited to 10
    alphanumeric characters.
- In the Adjustment Factor fields, specify the factor that will be used to
    adjust the priority of orders. A higher percentage increases the priority of an order and
    a lower percentage decreases it.
- If desired, repeat steps 3-6 to create additional priority
    categories. 
- Save your changes.