Forward Schedule Block Operations in Parallel
Explanation
Use this activity to forward schedule shop order operations 
connected to an operation block parallel to each others from a given start 
date/time.
Prerequisites
	- An operation block in status Planned, 
	Released or Started with one or several connected 
	operations must exist.
- The site should not use constraint based 
	scheduling server.
System Effects
	- As a result of this activity the Schedule 
	Direction for the operations connected to the operation block will be 
	set to Forward Scheduling and scheduled parallel to each others. The 
	Start Date of the operations will be set according to the start date 
	provided in the dialog box.
- Operations parallel to, and succeeding the rescheduled operations will 
	also be set to Forward Scheduling and rescheduled.
- If the Compress Operations check box is selected 
	and the new date/time for the rescheduled operation is later than the 
	original date/time, operations on the same shop order preceding the rescheduled operation will be set to 
	Backwards Scheduling 
	and rescheduled with a Finish Date 
	adjacent to the rescheduled 
	operation new Start Date.
Window
Operation Block
Operation Blocks
Shop Order
Shop Order Operations
Shop Floor Workbench
Related Window Descriptions
Schedule Operation Block
Operation Block
Operation Blocks
Connect Operation(s) to Operation Block
Shop Order/Operations
Shop Order 
Operations
Shop Floor Workbench
Related Visualization Chart Descriptions
Shop Order Machine Load
Shop Order Labor Load
Machine Operation Load In Standard Hours
Labor Operation Load In Standard Hours
Procedure
From Operation Block and Operation 
Blocks windows:
	- Search for the operation block you wish to 
	schedule.
- Right-click and click Schedule Operation Block. 
	The Schedule Operation Block dialog box appears.
- Select the Forward Scheduling option.
- Optionally, use the List of Values in the 
	Preceding Block field to select which operation block this block should 
	succeed. The Start Date will be set the same as the preceding block's 
	finish date, and the Preferred Resource will be set the same as the 
	preferred resource of the selected preceding block.
- Verify or enter the date/time on which you want 
	the operations in the operation block to start in the Start Date 
	field.
- Verify or enter the resource on which you want the 
	operations to be scheduled in the Preferred Resource field. Use the 
	List of Values to select from available work center resources.
- Select the Schedule in Parallel option.
- If you want to avoid slack between operations 
	preceding the block operation on the same shop order when rescheduled to a 
	later date/time, select the Compress Operations check box.
- Click OK.
From the Connect Operation(s) to Operation Block 
dialog box:
	- Select the Schedule Operation Block 
	check box and click OK, the Schedule Operation Block 
	dialog box appears.
- Select the Forward Scheduling option.
- Optionally, use the List of Values in the 
	Preceding Block field to select which operation block this block should 
	succeed. The Start Date will be set the same as the preceding block's 
	finish date, and the Preferred Resource will be set the same as the 
	preferred resource of the selected preceding block.
- Verify or enter the date/time on which you want 
	the operations in the operation block to start in the Start Date 
	field.
- Verify or enter the resource on which you want the 
	operations to be scheduled in the Preferred Resource field. Use the 
	List of Values to select from available work center resources.
- Select the Schedule in Parallel option.
- If you want to avoid slack between operations 
	preceding the block operation on the same shop order when rescheduled to a 
	later date/time, select the Compress Operations check box..
- Click OK.
From Shop Order Operations, Shop Order/Operations
and Shop Floor Workbench windows:
	- Search for the shop order operation connected to 
	operation block you wish to schedule.
- Right-click, point to Operation Block and 
	then click Schedule. 
	The Schedule Operation Block dialog box appears.
- Select the Forward Scheduling option.
- Optionally, use the List of Values in the 
	Preceding Block field to select which operation block this block should 
	succeed. The Start Date will be set the same as the preceding block's 
	finish date, and the Preferred Resource will be set the same as the 
	preferred resource of the selected preceding block.
- Verify or enter the date/time on which you want 
	the operations in the operation block to start in the Start Date 
	field.
- Verify or enter the resource on which you want the 
	operations to be scheduled in the Preferred Resource field. Use the 
	List of Values to select from available work center resources.
- Select the Schedule in Parallel option.
- If you want to avoid slack between operations 
	preceding the block operation on the same shop order when rescheduled to a 
	later date/time, select the Compress Operations check box..
- Click OK.
From a visualizer chart:
	- Open a visualizer enabled window and query for the 
	site needed.
- If the Data View is displayed, click 
	Visualization View on the title bar. 
- Right-click and click Select Visualization. 
	The Select Visualization dialog box is opened.
- Double-click Machine Operation Load in Standard 
	Hours, Labor Operation Load in Standard Hours, Shop 
	Order Machine Load or Shop Order Labor Load.
- Select the bar/segment representing the shop order 
	operation(s) connected to operation block you want to schedule, right-click, 
	point to Operation Block and then click Schedule. 
	The Schedule Operation Block dialog box appears.
- Select the Forward Scheduling option.
- Optionally, use the List of Values in the 
	Preceding Block field to select which operation block this block should 
	succeed. The Start Date will be set the same as the preceding block's 
	finish date, and the Preferred Resource will be set the same as the 
	preferred resource of the selected preceding block.
- Verify or enter the date/time on which you want 
	the operations in the operation block to start in the Start Date 
	field.
- Verify or enter the resource on which you want the 
	operations to be scheduled in the Preferred Resource field. Use the 
	List of Values to select from available work center resources.
- Select the Schedule in Parallel option.
- If you want to avoid slack between operations 
	preceding the block operation on the same shop order when rescheduled to a 
	later date/time, select the Compress Operations check box..
- Click OK.