Production Receipt
 
Explanation
 
This activity is used to report production has been completed and received 
into inventory from a production schedule. This is the standard activity for 
the reporting process. After a finished part or subassembly is produced, the 
part is ready to go into inventory. 
Note: Labor and operation setup time for each receipt is calculated as;
 
[(setup time/standard lot size)*receipt quantity]
If standard lot size is not defined, then the total setup time will be reported 
for every receipt. 
 
Prerequisites
 
- This activity requires the existence of a production schedule. Scheduled 
quantities for the part must exist. A part must be associated with a production 
line.
- The structure alternate cannot be a rework alternate.
System Effects
 
As a result of this activity: 
	- System backflushes the components and 
operations used in the manufacturing process. If inbound 
locations are defined, they are used by the backflush process in its search 
hierarchy. If outbound locations are defined, they are used as default receiving 
locations for production associated with the production line. If an alternate 
component substitution sequence is defined, it is used by the backflush process 
when issuing material.
- Inventory transactions are created for the receipt, as well as all 
	issued components. Quantities of the backflushed 
parts, received and issued in catch unit, will be saved on the record if it is 
entered.  
- Operation history transactions will be created 
for automatically reporting of machine or labor operations. 
- When selecting a scheduled 
receipt, the system automatically updates the production schedule. When 
	selecting an unscheduled receipt the production schedule is not updated.
Window
 
Production Receipt 
Production Schedule by Line 
Production Schedule by Line Part
Production Line
Management
 
Related Window Descriptions
 
Production Receipt 
Production Schedule by Line
Production Schedule by Line Part
 
Production Receipt
Production Line Management
Production Line Management/Current Production Schedule
Procedure
 
 
From the 
Production Receipt window:
 
	- Search for the production line and part.
- In the Sched Option list, select Scheduled 
  to consume from the quantity scheduled, or Unscheduled to not 
  consume from the scheduled quantity.
- In the Structure 
  area, specify the structure revision and structure alternate. If desired, also 
	specify the routing revision and the routing alternate.
- If you want the receipt to be executed as a background job, select the
	Receipt in Background check box.
- In the table section, create a new record and enter the quantity to 
  receive in the Qty Received field. 
 
- In 
	the Location No field, select the location to which the 
	parts should be received, or use the List of values to select available inventory locations.  
 
- If the part is catch unit enabled, the catch quantity 
	should also be entered in the Catch Quantity Received field. 
 
- Save.
From the Production Schedule by Line or Production 
Line Management/Current Production Schedule window:
 
    - Search for the production line for which you want to report production.
- Select the production schedule line for which you want to report a 
  production receipt, right-click and then click Production Receipt, 
  the Production Receipt dialog box appears.
- Type the 
	quantity of parts to report and receive into inventory in the Qty 
	Reported field. The scheduled quantity is the default value. If the part 
	is catch unit enabled, the catch quantity should also be entered in the 
  Catch Qty Reported field. 
    
- In the Sched Option list, select Scheduled 
  to consume from the quantity scheduled, or Unscheduled to not 
  consume from the scheduled quantity.
- If you want the receipt to be executed as a background job, select the
	Receipt in Background check box.
- In the Structure 
  area, specify the structure revision and structure alternate. If desired, also 
	specify the routing revision and the routing alternate.
- In the Location area, select 
	the Complete check box.
- In 
	the Location No field, select the location to which the 
	parts should be received, or use the List of values to select available inventory locations.
- Click OK.
From the 
Production Schedule by Line Part window:
 
  - Search for the part.
- Select the production schedule line for which you want to report a 
  production receipt, right-click and then click Production Receipt, 
  the Production Receipt dialog box appears.
- Type the 
	quantity of parts to report and receive into inventory in the Qty 
	Reported field. The scheduled quantity is the default value. If the part 
	is catch unit enabled, the catch quantity should also be entered in the 
  Catch Qty Reported field. 
    
- In the Sched Option list, select Scheduled 
  to consume from the quantity scheduled, or Unscheduled to not 
  consume from the scheduled quantity.
- If you want the receipt to be executed as a background job, select the
	Receipt in Background check box.
- In the Structure 
  area, specify the structure revision and structure alternate. If desired, also 
	specify the routing revision and the routing alternate.
- In the Location area, select 
	the Complete check box.
- In 
	the Location No field, select the location to which the 
	parts should be received, or use the List of values to select available inventory locations.
- Click OK.