Reschedule Shop Order
Explanation
This activity is used to reschedule a shop order. The activity can be 
performed using the Reschedule command from a shop order supply 
in the Inventory Part Availability chart.
This activity can be performed from IFS Aurena client only.
Prerequisites
An open shop order with remaining supply must exist.
System Effects
	- The shop order will receive a new Need Date according to the 
	value provided in the dialog box. If the date provided is a non-working day 
	the Need Date will be set to the first work day before the date 
	given.
- Schedule Direction for the order is set to 
	Backwards 
	Scheduling and the order will be rescheduled to 
	finish the last available work date/time before the date given.
-  If the shop order site is CBS server enabled, then scheduling 
	server will decide the start and finish time of the shop order. Thus it is 
	possible that the shop order gets scheduled way different time slot than 
	expected due to manufacturing resource capacity limitations. 