Perform Report Point Scrap
Explanation
This activity is used to declare report point scrap that occurred on the produced parts during the manufacturing process.
Note: Labor and operation setup time for each receipt is calculated as [(setup time/standard lot size)*receipt quantity] 
If standard lot size is not defined, then the total setup time will be reported for every receipt.
 
Prerequisites
	- This activity requires that a production schedule exists. 
	
- Report points must be defined for the production line 
System Effects
	- As a result of this activity, the system reports scrap for the parent part.
- If making a scheduled receipt, the system automatically
updates the production schedule. If making an unscheduled receipt, the system does not
automatically update the production schedule.
- Next, it runs the backflush process to consume the components used up to a defined report point. 
	
- If the
	Receipt in Background check box was selected, the receipt 
	is executed as a background job.
- The report point balance is not updated for the specific report point when scrapping.
	
- If a routing is defined, all operation steps falling between this report point and the previous one are scrapped at standard cost. 
	
- Operation-linked components used by the reported operations are scrapped. 
	
- Material not linked to operations is assumed to be required at the start of production. Thus, it is backflushed at the first report point. 
	
- If inbound locations are defined, they are used by backflush in its search hierarchy. 
	
- If an alternate component substitution sequence is defined, it is used by backflush when issuing material.
- Inventory transactions are created for the scrap receipt and all issued components.
	
- Operation history transactions are created for any backflushed machine or labor operations. 
	
Window
Report
Point Receipt 
Production
Receipt 
Production
Schedule by Line 
Production Schedule
by Line Part
Production Line
Management 
Related Window Descriptions
Report Point Receipt
Production Receipt   
Production Schedule by Line 
Production Schedule by Line Part 
Production Line Management
Production Line Management/Current 
Production Schedule
Scrap Receipt
Procedure
From the Report Point Receipt/Production Receipt window:
  - Open the Production Receipt window.
- In the Production Line list, select the production line and part for which
    to report scrap.
- Right-click and then click Scrap Receipt. The Scrap Receipt
    dialog box appears.
- In the Scrap Receipt window, select the Receipt in Background check box to execute the receipt in the background.
- In the  Structure area, specify the structure revision and
    structure alternate. If desired, also specify the routing revision and the routing
    alternate.
- In the Production Scrap 
  area, type the quantity scrapped in the 
	Qty
    Scrapped field. Click in the Scrap Reasons field, then click  
	List to select from
    available scrap reasons.
- In the  Report Point area, select the 
	Partial Scrap check box to
    declare a partial scrap at a report point. 
- In the Report Point area, specify the report point in the 
  Report
    Point ID field. Click 
	List to select from available report
    points.
- Click OK.
From the Production Schedule by Line or Production 
Line Management/Current Production Schedule window:
    - Search for the production line for which you want to report
    scrap.
- Select the production schedule line for which you want to report scrap. 
  Right-click and then click 
  Scrap Receipt. The Scrap Receipt 
	dialog box appears.
- In the Scrap Receipt window, select the Receipt in Background check box to execute the receipt in the background.
- In the Structure 
  area, specify the structure revision and
    structure alternate. If desired, also specify the routing revision and the routing
    alternate.
- In the  Production Scrap area, type the quantity scrapped in the 
	Qty
    Scrapped field. Click in the Scrap Reasons field, then click 
	List to select from
    available scrap reasons.
- In the Report Point area, select the 
	Partial Scrap check box to
    declare a partial scrap at a report point. 
- In the Report Point area, specify the report point in the 
	Report
    Point ID field. Click 
	List to select from available report
    points.
- Click OK.
From the Production Schedule by Line Part window:
 
  - Search for the part for which you want to report scrap.
- Select the production schedule for which you want to report scrap. 
	Right-click and then
    select Scrap Receipt. The Scrap Receipt 
	dialog box appears.
- In the Scrap Receipt window, select the Receipt in Background check box to execute the receipt in the background.
- In the Structure 
  area, specify the structure revision and
    structure alternate. If desired, also specify the routing revision and the routing
    alternate.
- In the Production Scrap 
  area, type the quantity scrapped in the 
	Qty
    Scrapped field. Click in the Scrap Reasons field, then click 
	List to select from
    available scrap reasons.
- In the Report Point 
  area, select the 
	Partial Scrap check box to
    declare a partial scrap at a report point. 
- In the Report Point area, specify the report point in the 
	Report
    Point ID field. Click 
	List to select from available report
    points.
- Click OK.