Redefine Supply Code for Component
Explanation
When a project connected shop order is created through a project 
miscellaneous demand, a customer order or a manual connection, the material list 
is always copied from manufacturing standards. If the shop order is connected to 
a project activity, it should be possible to issue material from either project 
inventory or the standard inventory. The Redefine Supply Code option for 
the components will change the supply code between invent order (where the 
material will be issued from standard inventory) and project inventory or 
project (where the material will be issued from project inventory). 
Both project and project inventory supply codes will reserve and issue material 
from the relevant project inventory and behave almost the same. The only 
difference between them is that the project inventory type components are 
planned by material planning tools like PMRP, while the project type components 
are not.
Prerequisites
  - A shop order must be connected to a project activity by a project 
	miscellaneous demand, a customer order or a manual connection.
- The shop order must have components defined.
- The components must not have been reserved.
System Effects
When a shop order is created from a project miscellaneous demand with the Shop 
Order supply option and the miscellaneous demand component method of the project is
Manually Planned.
	- If the supply code originally was Inventory Order, it is changed to 
	Project, and reservation and issue from project inventory is enabled for the 
	components.
- If the supply code originally was Project, it is changed to Inventory 
	Order, and reservation and issue from standard inventory is enabled for the 
	components.
else,
	- If the supply code originally was Inventory Order, it is changed to 
	Project Inventory, so that reservation and issue from project inventory is 
	enabled for the components.
- If the supply code originally was Project Inventory, it is changed
    to Inventory Order, so that reservation and issue from standard
    inventory is enabled for the components.
Window
Shop Order
Shop Order Materials
Related Window Descriptions
Shop Order/Materials
Shop Order Materials
Procedure
  - Open the Shop Order/Materials or
  Shop Order Materials window and search for the 
  record for which you want to redefine the supply 
  code.
- Select the component material line/lines for which you wish to redefine the supply code. 
	Right-click and then click Redefine Supply Code.