Production Receipt with Catch Unit Components 
Explanation
This activity is used to report production has been completed and received 
into inventory from a production schedule for a part with catch unit enabled 
components. A catch unit is enabled to allow a specific
inventory part to manage two parallel units of measure. Information regarding 
both quantities, inventory and catch, are saved on every inventory transaction
record.
Prerequisites
	- A part can be reserved as a catch quantity only if it
is catch unit enabled. 
- If catch unit is enabled for the parent 
part, the quantity reported must have been entered in both the inventory unit of
measure (UoM) and catch UoM.          
	
- The structure alternate cannot be a rework alternate.
System Effects
  - The reserved quantities in both the catch UoM and
    inventory 
UoM will be issued during backflush.
- Inventory locations will be updated with issued and received quantities.
Window
Production 
Receipt 
Production 
Schedule By Line 
Production Schedule By Line Part
Production Line
Management
Related Window Descriptions
Production Receipt
Production Schedule by Line
 
Production Schedule by Line Part
Production Line Management
Production Line Management/Current Production Schedule
Procedure
From the 
Production Receipt window: 
    - Search for the production line and part. 
- In the Sched Option list, select Scheduled 
	to consume from the quantity scheduled, or Unscheduled to 
	not consume from the scheduled quantity. 
- 
	In the 
	Structure area, 
	specify either the the structure/routing revision, or the 
	structure/routing alternate. 
- 
	If you want the receipt to be executed as a background job, select the
	Receipt in Background check box. 
- In the table section, create a new record and enter the quantity to 
	receive in the Qty Received field. 
- In the Location No field, select the location to which 
	the parts should be received, or use the List of values to select available 
	inventory locations. 
- 
	If the part is catch unit enabled, the catch quantity should also be 
	entered in the Catch Quantity Received field. 
- 
	Select the  Edit Components 
	check box and save, the 
	Production 
	Receipt Material dialog box appears. 
- 
	To change the quantity to issue, enter the desired 
	value in Qty to Issue field. 
- 
	
	Save. 
- 
	To reserve the components before backflushing, select 
	the component and then click 
	Assign. The 
	Production 
	Receipt Reservation dialog box appears. 
- 
	In the 
	Production Receipt Reservation 
	dialog box, click Create. The 
	Inventory Part Location
	dialog box appears. 
- 
	In the 
	Inventory Part Location 
	dialog box, select a location and click 
	OK. 
- 
    In the 
	Production Receipt Reservation 
	dialog box, enter a value in the Qty Assigned field. Also enter the catch 
	quantity that you want to reserve in the Catch Qty Assigned field.  
	
- 
    Save and then 
	click OK when the reservations are done. 
	
- 
	When you have finished editing and reserving the components, click 
	 OK to run the backflush.  
 
From the Production Schedule by Line or Production 
Line Management/Current Production Schedule window: 
 
 
	- Search for the production line.
- Select the production schedule line for which you want to report a 
	production receipt, right-click and then click Production Receipt, 
	the Production Receipt dialog box appears.
- Enter the quantity of parts to report and receive into inventory in the
	Qty Reported field. The scheduled quantity is the default 
	value. If the part is catch unit enabled, the catch quantity should also be 
	entered in the Catch Qty Reported field. 
- In the Sched Option list, select Scheduled 
	to consume from the quantity scheduled, or Unscheduled to 
	not consume from the scheduled quantity.
- 
	If you want the receipt to be executed as a background job, select the
	Receipt in Background check box.
- 
	In the 
	Structure area, specify the structure revision and the structure alternate. If desired, 
	you can specify the routing revision and the routing alternate. 
- 
	In the 
	Location area, select the 
	
	Complete check box to create a complete production receipt. 
	
- 
	In the 
	Location area, click 
    in the 
	Location No field and then click 
	List to choose from different 
	inventory locations. 
- 
	To edit components, click 
	Components. The 
	Production Receipt Material dialog box appears. 
	
- 
	In the 
	Production Receipt Material 
	dialog box, type a value in the Qty To Issue field. 
- 
	To change the components, click  
	New. In the Part To Issue 
    field, enter or select an available part from the List of Values. Next,
    enter a value in Qty to Issue field. 
- 
	
	Save. 
- 
	To reserve the components before backflushing, select 
	the components and then click 
	Assign. The 
	Production 
	Receipt Reservation dialog box appears. 
- 
	In the 
	Production Receipt Reservation 
	dialog box, click Create. The 
	Inventory Part Location 
	dialog box appears. 
- 
	In the 
	Inventory Part Location 
	dialog box, select a location. Click  
	OK. 
- 
    In the 
	Production Receipt Reservation 
	dialog box, enter a value in the Qty Assigned field. Also enter the catch 
	quantity that you want to reserve in the Catch Qty Assigned field.    
- 
    Save and then 
	click OK when the reservations are done. 
- 
	When you have finished editing and reserving the components, click 
	OK  to run the
    backflush.
 
From the 
Production Schedule By Line Part window:
	- Search for the part.
- Select the production schedule line for which you want to report a 
  production receipt, right-click and then click Production Receipt, 
  the Production Receipt dialog box appears.
- Type the 
	quantity of parts to report and receive into inventory in the Qty 
	Reported field. The scheduled quantity is the default value. If the part 
	is catch unit enabled, the catch quantity should also be entered in the 
    Catch Qty Reported field. 
    
- In the Sched Option list, select Scheduled 
  to consume from the quantity scheduled, or Unscheduled to not 
  consume from the scheduled quantity.
- If you want the receipt to be executed as a background job, select the
	Receipt in Background check box.
- 
	In the  
	Structure 
	area, specify the structure revision and the structure alternate. If you
    want, 
	you can specify the routing revision and the routing alternate. 
- 
	Select the Complete check box to create a 
	complete production receipt. 
- 
	In the 
	Location area, click 
    in the 
	Location No field and then click  
	List 
	to choose from different 
	inventory locations. 
- 
	To edit the components, click 
	Components. The 
	Production Receipt Material dialog box appears.
- 
	In the 
	Production Receipt Material 
	dialog box, enter a value in the Qty To Issue field. 
- 
	To change the components, click 
	New. In the Part To Issue 
    field, enter or select 
	an available part from the List of Values. Next,
    enter a value in Qty to Issue field. 
- 
	Save. 
- 
	To reserve the components before backflushing, select 
	the components and then click 
	Assign. The 
	Production 
	Receipt Reservation dialog box appears.
- 
	In the 
	Production Receipt Reservation 
	dialog box, enter a value in the Qty Assigned field. Also enter the catch 
	quantity that you want to reserve in the Catch Qty Assigned field.    
- 
	Save and then 
	click OK when the reservations are done.
- 
	When you have finished editing and reserving the components, click 
	OK  
	to run the backflush.