Mark Structure Component as Not Present
Explanation
This activity is 
used to remove a structure component that was not present in the actual structure 
received to the repair  from the new as-built structure created after the 
repair.
Prerequisites
Multilevel repair 
shop order must exist with the parent part in Reserved or Issued state.
System 
Effects
As a result of 
this activity, the number of components marked as Not Present will not be added in 
the new as-built structure. Since there is no existing component, there will be no 
inventory transactions as well.
Window
Shop Order
Related 
Window Descriptions
Component Replacement Details
Procedure
	- 
	Open the 
	Shop Order 
	window 
	and query for your multilevel repair shop order.
- 
	Make sure that the state 
	of the parent material line is Reserved or Issued.
- 
	Open the 
	Multilevel Repair Structure 
	tab.
- 
	Select the top part from 
	the graphical tree structure, right-click and then click Expand Descendents.
- 
	Select the revision node 
	of the parent part in which you want to mark a component as not present.
- 
	Right-click and then click 
	Component Replacement to open the Component Replacement Details dialog 
	box 
	with the parent part you selected in the header as the parent part.
- 
	Select the component line you 
	wish to mark as not present and then change the Repair Action to 
	Not Present.
- 
	Enter the component quantity not present in the 
	Comp Qty to be Removed field.
- 
	Enter the repair reason 
	for the structure changes. Here you can get the List of Values. 
	
- 
	Click Apply or OK.