Evaluate Result using CBS
Explanation
Use this feature to evaluate the results after rescheduling the operations.
Prerequisites
A site connected to a constraint based scheduler must exist. 
System Effects
There are no system effects.
Window
Scheduling Client
Related Window Descriptions
Scheduling Client
Gantt Chart
Data Tree
Procedure
  - Open the Scheduling Client dialog box.  
- Enter the site for which you want to evaluate the results in the Site field. Use 
  	List
    to select from available sites.
- Specify for how long you want to be able to use the scheduling client in the 
	Time Limit
    field.
- Click OK. This action will start the scheduling client where you can study the
    results.