Analyze Labor Availability using Visualizer Charts
Explanation
Use this activity to analyze labor load relative to the available 
labor 
capacity using visualizer charts.
Prerequisites
	- To visualize capacity, the labor capacity must have been calculated for the 
site using Calculate Labor Capacity for Manufacturing dialog box. 
	
- To visualize loads from sources other then shop order, the capacity 
	requirements planning must be performed for the site using Perform CRP 
dialog box.
System Effects
The labor availability for the queried load sources are displayed.
Window
N/A
Related Window Descriptions
N/A
Related Visualization Chart Descriptions
Labor Load Summary
Labor Load
Labor Load In Standard Hours
Labor Operation Load In Standard Hours
Shop Order Labor Load
Procedure
	- Open a visualizer enabled window 
	and search for the data to be analyzed. 
- If the Data View is displayed, click Visualization View on the title bar. 
	
- Click the Configure Visualizations icon on the topmost right 
	hand corner. The Visualization Settings 
	dialog box is opened.
- Drag charts from Available Charts to Chart Layout from the charts listed under 
	Labor Availability.
- Use the Labor Load Summary to analyze the 
	worst case labor availability for the queried time interval per site or 
	labor class.
- Use the Labor Load in Standard Hours to analyze the 
	labor 
	load relative the available capacity per day, or week.
- Use the Labor Operation Load in Standard Hours
	to analyze and 
	reschedule the labor load per operation relative the available capacity 
	per day, or week.
- Use the Labor Load to analyze the labor load and load 
	category per day, or week and labor class.
- Use the Shop Order Labor Load to analyze and modify the 
	scheduling of shop orders, or shop order operations.
- Click OK.