Adjust Split Operations
Explanation
This activity is used to adjust the operation quantities within split operations. 
Operations material will be connected only to the parent operation even after 
the split or adjust action.
In APB or CBS server solution enabled sites, if there is a material 
constraint (finite or always finite material) for the operation and if the 
operation is split, the material constraint is connected only to the parent 
operation and split operations will not be constrained by the material 
constraint. 
Prerequisites
To perform this activity, split operations must exist for the shop order.
System Effects
As a result of this activity, operation quantities assigned to the split 
operations will be redistributed as the user defines.
Window
Shop Order 
Shop Floor Workbench
Shop Order Operations
Related Window Descriptions
Shop Order
Shop Floor Workbench
Shop Order Operations
Adjust Split Operations
Related Visualization Chart Descriptions
Shop Order Machine Load
Shop Order Labor Load
Procedure
To adjust a split operation using 
the data view:
  - In the 
	Shop Order window 
	
	Operation tab,
	Shop Floor Workbench or 
	Shop Order Operations 
	window search for the shop order operation in which you want to adjust the operation quantities.
- Select one of the split operations, right-click and click Shop Order 
	Operation Split/Adjust . This will open the Adjust Split Shop 
	Order Operations dialog box with all the split operations connected to the 
	selected operation populated.
- Redistribute the operation quantities on operations by adjusting the 
	New Qty to Report field. 
- Click OK.
To adjust a split operation using 
the visualization view:
	- Open a visualizer enabled window 
	and query for the site needed .
- If the Data View is displayed, click 
	Visualization View on the title bar. 
	
- Right-click and click 
	Select Visualization. 
	The 
	Select Visualization dialog box is 
	opened.
- Double-click Shop Order 
	Machine Load or Shop Order Labor Load.
- Right-click and click Y-Axis/Shop Order Operation.
- Select the inner segment 
	representing the shop order operation you want to adjust, right-click, point 
	to 
	Shop Order Operation Split 
	and then click Adjust. This 
	will open the
	Adjust Split Shop 
	Order Operations dialog box with all the split operations connected to the 
	selected operation populated.
- Redistribute the operation quantities on operations by adjusting the 
	
	New Qty to Report 
	field. 
	
- Click 
	OK.