Add Shop Order Operation
Explanation
This activity is used to add an operation that is not registered in the parent part's
operation list, e.g., an operation that is needed only for this shop order.
Outside operations added to the released shop orders will create the appropriate type of supply, based on the
outside operation supply type.
(Refer About Routing Master Data.)
Prerequisites
  - The shop order must not have status Closed or Cancelled.
- Succeeding outside operations must not have been
    started for the newly added outside operations.
System Effects
As a result of this activity,
  - The system adds an operation to a specific shop order.
This addition affects only this shop order, not the parent part's entire operation list.
- If the shop order is released, a purchase
    requisition, a planned purchase order line, or a released purchase order line will be created
    for the operation depending on the outside operation supply type.
Window
Shop Order
MRO Shop Order
Disposition 
Shop Order
Related Window Descriptions
Shop Order
Shop Order/Operations
Create Outside Operation
MRO Shop Order
MRO Shop Order/Operations
Disposition Shop Order/Operations
Disposition Shop Order
Procedure
  - Create a new line in the 
	Operations tab.
- In the  Operation No field, enter a number for the operation.
- In the  Operation Description field, enter a description of the operation.
- In the  Work Center No field, specify the work center where the operation will be
    performed. Use the List of Values to select from available work centers.
- Specify machine time and/or labor time in the  Machine Setup Time, Machine 
	Run
    Factor,  Labor Setup Time, and  Labor Factor fields.
- In the Operation Work Type field, select whether the work to be 
	performed on the operation should be considered Normal, Non 
	Routine or Rework. 
- Resource Share is by default 
	1, meaning that the full resource capacity is utilized for the duration of 
	the operation. If the operation utilizes part of the resource capacity, 
	define the share in Resource Share field, or specify 
	how much of the total capacity one unit will utilize in the Resource 
	Share per Unit field.
- If desired, change the unit of measure for the manufacturing time in the  Factor Unit
    field.
-  If specifying labor setup time, enter relevant values in the Setup Labor Class and 
	Setup Crew Size fields. Use the List of Values to select from available values. You can also enter an employee setup 
	qualification 
	profile in the Emp Setup Qual Profile field.
	
 
-  If specifying labor run-time, enter values in the Labor Class and 
	Crew Size fields. Use the List of Values to select from available values. You can also enter an employee 
	qualification profile in 
	the Emp Qual Profile field.
- If specifying overlap, enter the required value in the Overlap field and select the applicable unit in the Overlap Unit 
	field.
- Select the Setup Inside Overlap check box if you want the setup time to be included in the overlap.
	
 Note: The meaning of operation overlap is how early a succeeding 
	operation is allowed to start in relation to its latest scheduled preceding 
	operation start time. (For more details refer to Operation Overlap about 
	description).
- If you are specifying an outside operation, select an outside operation item in the Outside Op Item column. Click List of Values to select from available parts. This part must be defined as a non-inventory purchase part. If the outside operation item and the outside work center is not connected to the same supplier, there will be a warning. Proceeding further will result in a purchase requisition without a supplier 
	if the Outside Op Supply is set to Purchase Requisition. If Outside Op Supply is set to Planned or Released purchase order, you will get an error and no purchase order will be created.
- If the operation is for an outside work center, select the Outside Op Supply Type from the 
	list box. 
- If you are specifying an outside operation, you have to the select the option Send to Next Supplier check box.
	
 Note: When the Send to Next Supplier check box is selected it 
	indicates that the outside operation items should be sent directly from the 
	supplier connected to the outside operation to the supplier connected to the 
	consecutive operation, assuming that the consecutive operation is also 
	defined as an outside operation. (For more details see the 
   Outside Operations topic).
- In the Service Type field enter a service type. Use the List of 
	values to select a suitable value and the component repair order line 
	connected service type(s) will be listed.
 Note: This field is enabled only if the shop order is a repair shop 
	order and if it is originated from a CRO line.
- Optionally, enter a reference number in the 
	Reference Number field and use the List of Values to select a reference 
	type in the Reference Type field.
- Save.
- If no outside operation item has been entered for an outside operation, 
  the Create Outside Operation Item and Connect to Supplier dialog box 
	 will open. Enter part number, description and unit of measure in Purchase Part No, 
  Part Description and UoM fields respectively. If you know the supplier and price information, enter the Supplier ID, Price and UoM fields respectively. 
  
 Note :  Currency will get the default value from the supplier. The UoM field will get the default value from unit of measure of the routing part. If supplier is related to the outside work center, it will also get the default value from the work center