Perform a Direct Revision Transfer for a Site
Explanation
Use this activity to perform a direct transfer of one or more engineering 
revisions to a site. You can select whether you want to perform a single level 
transfer or transfer all levels of the parts. The process creates the parts, 
part revisions, and structure data needed. You can create 
either manufacturing structures or prototype structures.
Since the application uses date effectivity, the transfer will attempt to use 
the tentative revision that has a phase-in or effective date that is closest to 
the date that is listed in the proposed start date in the Engineering transfer 
windows. If no tentative revision exists, the system will either create the 
first revision, as is the case when the part is new to the manufacturing site, 
or it will create a revision that is numbered sequentially from the latest 
revision that is presently buildable. This situation will occur except when the 
first revision is tentative, the system will not use the first tentative 
revision, instead system will create a second tentative revision. When 
additional revisions are transferred, the system will overwrite the structure of 
the second revision until the second revision is made buildable. Any unwanted 
tentative revisions for the parts should be canceled before the transfer, in 
order to avoid overwriting.
Prototype structures will create a unique Part Revision with the 
Prototype Part Revision Prefix defined
 in the  Site/Manufacturing tab. Prototype structures are created in Tentative state and will not 
be overwritten by different
  engineering part revisions, but will always create a new  prototype structure in an engineering transfer.
   However, if an already transferred engineering part revision is transferred again due to changes in the engineering 
   structure it will overwrite the particular prototype structure related to the engineering part revision. 
   Creating prototype structures via an engineering transfer can be done only for single level transfers.
In addition, depending on the part transfer template used, alternate 
components defined in engineering may also be transferred over, and may 
overwrite existing alternate components defined in manufacturing. 
Prerequisites
This activity has the following prerequisites: 
  - The destination site must exist in the system.
- The engineering revision must exist.
- Prototype Part Revision Prefix must be defined in the 
	 
	Site/Manufacturing tab in order to create prototype structures.
System Effects
As a result of this activity:
  - The system performs a direct transfer of an engineering revision or 
	revisions to a site. 
-  Data about one or more new parts, part revisions, and structures is 
	created if needed. 
-  Data about alternate components for each part in the structure may be 
	transferred.
-  If the direct transfer is processed for a single level, routing 
	information based on a routing template may also be created. 
-  If you start the direct transfer function in the 
	
	Engineering Revision Transfers 
	window, the engineering revision or revisions are moved from the 
	Engineering Revision Transfers window to the 
	Engineering Revision Transfer Actions window.
-  In the Engineering Revision Transfer Actions 
	window, the status of the particular part is changed from Active to 
	Transferred.
Window
Engineering Revision Transfers
Engineering 
Revision Transfer Actions
Related Window Descriptions
Engineering Revision Transfers
Engineering Revision 
Transfer Actions
Procedure
Engineering Revision Transfers: 
  - Open the  Engineering Revision Transfers window.
- Select the destination site in the   Current Site field. Use 
	the List of Values to select from available sites.
- Populate or query  to retrieve the part records.
- Select the engineering revision for which you want to start a direct 
	transfer.
- Right-click and then click Direct Transfer. The 
	Transfer 
	Parameter dialog box will be opened.
- Select either Single Level Transfer or All Level Transfer, depending on the levels you want to transfer.
- Select Include parts where part type has been changed check box for the system to identify  the 
	transferable parts 
    during the next transfer, if there is a difference between the values in Part Type  and  Current Inventory Part Type fields in 
    Engineering Revision Transfer Actions
    window. This is similar in changing the PDM preliminary rev change from Not Changed to Changed. 
 Please note that changes to part type should always be done in the inventory 
 part first.
- Select Include Proposed Start and/or End Date(s) check box to include the proposed start date and/or end date specified in the selected engineering revision(s) during a
    single level or all level transfer to its component parts. If the proposed start date is not defined, the current system date will be considered for the transfer.
- Select the Create Prototype Structure check box ,If you want to create the prototype structures via an engineering transfer
- Select  Execute Transfer Online  check box to execute the engineering transfer process online.
- Click OK.
Engineering Revision Transfer Actions: 
  - Open the Engineering Revision Transfer Actions
    window.
- Populate or query for the part number.
- Right-click and then click Direct Transfer. The Transfer Parameter dialog box will be opened.
- Select either Single Level Transfer or All Level Transfer, depending on the levels you want to transfer.
- Select Include parts where part type has been changed check box for the system to identify  the 
	transferable parts 
    during the next transfer, if there is a difference between the values in Part Type  and  Current Inventory Part Type fields in 
    Engineering Revision Transfer Actions
    window. This is similar in changing the PDM preliminary rev change from Not Changed to Changed. 
 Please note that changes to part type should always be done in the inventory 
 part first.
- Select Include Proposed Start and/or End Date(s) check box to include the proposed start date and/or end date specified in the selected engineering revision(s) during a
    single level or all level transfer to its component parts. If the proposed start date is not defined, the current system date will be considered for the transfer.
- Select the Create Prototype Structure check box ,If you want to create the prototype structures via an engineering transfer
- Select  Execute Transfer Online  check box to execute the engineering transfer process online.
- Click OK.
Note: If the Execute Transfer Online option is not clicked, this activity 
will be performed as a background job. Open the 
Background Jobs 
window and populate to view the background job created for this job. This 
background job comes with a description of Direct Engineering Transfer 
Processing. Once this job is processed the status changes to Ready, upon 
which the structure is transferred to Manufacturing.
If the transfer is done for the first time for a part, the Std planned 
Item check box will automatically be selected in 
Product Structure window. It is possible for you to modify this check 
box in the 
Product Structure window. Once this check box is 
selected in 
Product Structure window, the setting of this flag on 
any future transfers are ignored. 
There are two reasons due to which the job can get stuck at the Executing  status when it is performed as a background job:
  
   - The status change has not occurred from Executing to Ready 
	after the job is processed.
- The job is really stuck at Executing status.
Subsequently if any Engineering transfers are done for the same site
  
   - For a change in structure of the part which you tried to transfer 
	earlier.
- For another part on the same site.
These jobs do not get transferred. When this new structure is transferred it 
creates a background job which is re-submitted 15 times. The last re-submit 
gives the following message:
“This job on site XX failed due to a job stuck in Executing state. Delete the 
stuck job and retransfer.”
When you get the above message you should note the Job ID of the job which is 
stuck in Executing status and delete it using the delete (X) option in the 
Background Jobs window.
You have to re-transfer the jobs which have not got transferred using the 
Engineering Revision Transfer Actions window.
 
Note: A job stuck while executing affects only the future jobs that 
will be transferred for the same site.