Move Node
Explanation
This activity is used to disconnect a node with reporting entity connections 
from the node above it, and then connect it to another node via a single structure 
operation. The node will be moved together with 
connected reporting entities and sub nodes. 
Prerequisites
In order to perform this activity, the status of the 
consolidation structure should be In Progress.
System Effects
As a result of this activity:
	- Disconnect transactions are created for the 
	connection between the moved node and the node to which it previously belonged.
 
	- A new connection is created between the moved node and the new node to which 
	it belongs.
 
Window
Consolidation Structure
Related Window Descriptions
Consolidation Structure
Move Node
Procedure
To move a node:
	- Open the Consolidation 
	Structure window and search for the consolidation structure 
	in which the node to be moved exists.
 
	- Right-click on the node to be moved and click Move Node to open the
	Move Node dialog 
	box.
 
	- In the Node field in the Move To group box, enter the new node 
	to which the node being moved should belong. The List of Values can be used 
	to select the required node.
 
	- In the Ownership field, enter the ownership percentage for the new 
	connection.
 
	- Select a value for the Consolidation Method 
	field. 
 
	- In the Event Date field, enter the date from which the 
	effect of node 
	connections resulting from the move should be valid.
 
	- Modify the value displayed in the Period field if required. (Note: The period is automatically displayed when you 
	enter a date in the Event Date field.)
 
	- Enter a description in the Comment field if required.
 
	- Double click on the Notes check box, if you 
	want to enter notes.
 
	- Click OK.