Connect Dimension Value
Explanation
This activity is used to connect dimension values to a node in a parallel 
consolidation structure.
Prerequisites
In order to perform this activity:
	- A parallel consolidation structure of the In Progress status 
	should exist.
 
	- At least one node should be available in the parallel consolidation 
	structure.
 
	- One or more dimension values should exist.
 
System Effects
As a result of this activity, a dimension value is connected to the parallel 
consolidation structure.
Window
Parallel Consolidation Structure
Related Window Descriptions
Parallel Consolidation 
Structure
Connect Dimension Value
Procedure
To connect a dimension value to a parallel consolidation structure:
	- Open Parallel Consolidation Structure window and search 
	for the parallel consolidation structure to which the dimension value should 
	be connected.
 
	- Right-click on the node (or top node) to which the dimension value 
	should be connected and click Connect Dimension Value to open the 
	Connect Dimension Value dialog box.
 
	- Enter the dimension value you want to connect to the parallel 
	consolidation structure in the Dimension Value field. The List of 
	Values can be used to select the required dimension value.
 
	- Enter the date on which the dimension value is connected in the Event 
	Date field.
 
	- Modify the value in the Period field if required. (Note: A 
	period is automatically displayed when you enter a date in the Event Date 
	field.)
 
	- Enter a description of the event in the Comment field if 
	required.
 
	- Double click on the Notes check box if you want to enter notes 
	for the connection of the dimension value.
 
	- Click OK.