Release MRO Interim Order Structure
Explanation
Use this activity to release a MRO interim order structure, thereby creating
and scheduling the corresponding supply shop orders. The start and finish dates
assigned by the scheduling process to the supply shop orders does not impact the
dates of the corresponding interim orders.
It is possible to manually include components in the 
work scope of a shop visit from the Disposition Summary window. 
This makes it possible to expand the work scope when the available maintenance 
levels do not sufficiently cover the maintenance requirements. When a component 
is included the work scope can be released. If it is set to be released, then it 
is an option to release the MRO Interim Order Structure as a part of this 
action. 
Prerequisites
The interim header must be in Created or Partially Created state.
System Effects
As a result of this activity:
  - Supply shop orders in state Planned are created for the interim
    orders that are released. These shop orders are scheduled by the shop order
    loader or by CBS.
- An expected log and an off log are created in
VIM. The expected log holds the parts and serials that are expected from
disassembly based on the VIM serial structure. The off log is initially
    identical to the expected log but is updated during disassembly with the actual
parts received.
Window
MRO Interim Order Structure
Related Window Descriptions
MRO Interim Order Structure
Procedure
MRO Interim Order Structure window
  - 
From the Interim Header ID list, select the interim order structure to release.
  
- 
Verify that the state of the interim header is Created or Partially Created.
  
- 
Right-click and then click Release to release the entire selected interim 
header. This will create MRO shop orders for all types of interim orders in the 
order structure (i.e., disassembly, disposition, and assembly orders). If the state 
of the interim header is Partially Created, which means that some interim orders in the 
order structure have already been released, then releasing the entire interim
order structure releases the remaining interim orders.
  
Disposition Summary 
window
	- Open the Disposition Summary window.
- Select the work order number for your work order part by populating (F2) or by 
making a selective query (F3).
- Select the line which holds the component to be included in the work scope.
- Right-click from the line and select the option Include to Work Scope.
- When including a component to the work scope a re-released is possible to 
perform of the MRO Interim Order Structure as a part of this action, if the 
check box Release Interim Order Structure is selected.
 
 Note: If the check box Release Interim Order Structure is selected then is also 
the check box Release Work Scope selected automatically, i.e. it is not possible 
to release the interim order structure without first releasing the work scope.
 
- Press OK button.
 
 Note: If the check box Release Interim Order Structure is selected there is an 
option to run the release in back ground.