Specify Budget Template Structure
Explanation
This activity is used to define the budget template structure.
The budget structure is based on the templates defined within the budget
process. For each node it will be possible to define a budget responsible user and an
approver. When a user is defined as responsible or approver for a node, the user
should be able to view all budget templates and nodes. The graphical presentation of the structure will show the following
information for all templates; Status, Responsible, Approver, Due Date and Last
Modified. 
Prerequisites
Budget templates and user roles need to be
specified. 
System Effects
As a result you are allowed to create a structure and
connect the template to a node.
Window
Budget Structure
Related Window Descriptions
Budget Structure
Procedure
  - Open Budget Structure 
	window. 
  
 - Enter budget structure ID and description.
  
 - Select budget process ID from the List of
    Values.
 
  - Under  
	Nodes   tab specify the budget
    node ID and description.
  
 - Enter node above. Note: This is not
    possible when entering the first budget node ID. 
 
  - Enter due date if required.
 
  - Enter approver and user responsible from the
    List of Values. 
 
  - Select the Notes check box to enter notes.
 
  - In the 
	Template tab specify the budget
    template ID using the List of Values.
 
  - Connect the budget template to a node by specifying
    the node using the List of Values. 
 
  - Specify the due
    date if required.
 
	- In the 
	Template  
	tab it is also possible to connect documents by using Attachments.
 
  - Select the 
	View Structure tab. Mark the levels. The layout
    is displayed automatically in the Structure Layout field. Note: You can drag and
    drop a node to add it under another node, and you can drag and drop
    unassigned or assigned templates to another node. When you do this, the system moves the values along
    with the picture so that the correct information is displayed in the  
	Nodes and
     
	Template tabs. The drag and drop operation can be performed
    by dragging
    an object and dropping it onto a node. You cannot use the copy and paste operation, since nodes or code
    part values cannot be duplicated in the structure through this operation.